澳门新萄京8522-新闻资讯>常见问题>新萄京8522教你怎么计算热移位要求!

其他案例

新萄京8522教你怎么计算热移位要求!

来源:     发表日期: 2018-12-12 11:40:24     浏览次数:次    
  归纳支吊架主要用于电厂汽水管道或锅炉设备、在运行中产生热位移及其设备装置上。根据管道受力状况计算确定的绷簧支吊架工作和热位移要求,本厂将绷簧支吊架依照规划荷载进行整定:即绷簧预压并所定冷态荷载方位上;一起标上冷态时的理论理论工作方位。
  It is concluded that the support and hanger are mainly used in steam and water pipes or boiler equipment of power plants, heat displacement and equipment devices during operation. According to the requirement of working and thermal displacement of tension spring suspension bracket determined by calculation of stress condition of pipeline, the factory adjusts the tension spring suspension bracket according to planning load: that is, tension spring preloading and the orientation of cold load; together, the theoretical working position of cold state is marked.
  绷簧支吊架在出厂前制造厂进行了整定,当安装了高空吊篮和设备上后,作有关螺纹调整,将所定销脱开,这时绷簧的实际承载就是规划所要求的冷态荷载。
  The tension spring suspension frame was adjusted in the factory before leaving the factory. When the hanging basket and equipment were installed, the thread was adjusted and the fixed pin was removed. The actual load of tension spring is the cold load required by the planning.
  归纳支吊架型号、种类
  Induction of Types and Types of Supporting and Suspension Frames
  可变式绷簧支吊架有四大系列,主要是由西北电力规划院规划的 T1、T2、T3、T4、T5型系列、华东电力规划院规划的TH1、TH2、TH3型系列、TD系列(JB/J8130.2-1999)和化工规划院规划的VS系列,其系列的根本特性相同,承载力为20daN-21000daN。结构形式主要有悬吊式、支承式和并联悬吊支承式。
  There are four series of variable spring-tensioned suspension frame, which are mainly T1, T2, T3, T4, T5 series planned by Northwest Electric Power Planning Institute, TH1, TH2, TH3 series planned by East China Electric Power Planning Institute, TD series (JB/J8130.2-1999) and VS series planned by Chemical Planning Institute. Their basic characteristics are the same, and their bearing capacity is 20daN-21000daN. The main structural forms are suspension type, support type and parallel suspension support type.
  优化准则:
  Optimizing criteria:
  1、因为地铁工程地下空间狭小,而所涉及到的机电管线品种繁多,有通风空调、建筑电气、智能建筑、给排水及消防、喷淋、通讯、信号等众多专业的管线。因为管线功用种类多,施工的方法不尽相同,有风管、给水及消防管、高压细水雾管、空调冷水管、高低压电缆桥架、通号线槽、照明、控制、监控等线管;管线自身特点不同,安装的要求不同:如强电与弱电、有压与无压、高压与低压、大管与小管、平行与穿插等,假如不统一布置和提早规划,其各专业管线的抵触将伴随施工的整个进程。
  1. Because the underground space of metro project is narrow, there are many kinds of mechanical and electrical pipelines involved, such as ventilation and air conditioning, building electrical, intelligent building, water supply and drainage, fire protection, sprinkler, communication, signal and many other professional pipelines. Because there are many kinds of pipeline functions, the construction methods are different, such as air duct, water supply and fire control pipe, high-pressure water mist pipe, air conditioning cold pipe, high-low voltage cable bridge, through-line trough, lighting, control, monitoring and other pipelines; the pipeline has different characteristics, and the installation requirements are different: such as strong and weak electricity, voltage and no-voltage, high and low voltage, large and small pipes, parallel and interpolation. If not unified layout and early planning, the conflict of its professional pipelines will accompany the whole process of construction.
澳门新萄京8522
  2、在优化归纳管线时,制定了可供多方遵循的躲避准则:
  2. When optimizing and summarizing pipelines, evasion criteria are formulated for many parties to follow.
  1)在归纳支吊架上安装的各专业管线遵守“电上、风中、水下,小管让大管、有压管让无压管、弱电避强电、易弯曲的管线让不易弯曲的管线、不用经常检修的管让需经常检修的管”的总准则,即平行布置管线时电气设备的管线坐落上方,通风空调的风管坐落中间层,一切水管坐落下层。
  1) The professional pipes installed on the inductive support and hanger shall abide by the general principles of "on-line, in-wind and underwater, small pipes for large pipes, pressure pipes for non-pressure pipes, weak current for avoiding strong electricity, flexible pipes for non-bending pipes, pipes for frequent maintenance without frequent maintenance", that is, when parallel pipes are arranged, the pipes of electrical equipment are located at the top, and the wind pipes of ventilation and air conditioning are located in the middle. Floor, all water pipes are located at the lowest level.
  2)强电与弱电、高压与低压、强弱电与其它管线间应按各自的标准要求,多走平行方向;平行与穿插应能确保标准要求的小距离进行施工或互谦,如遇有抵触管线时应加保护措施。处理各专业管道的干扰、磕碰问题,协调好风管、水管、电缆桥架、消防、给排水管及通讯、信号桥架等走向抵触矛盾。
  2) Strong and weak electricity, high and low voltage, strong and weak electricity and other pipelines should follow their own standard requirements, more parallel direction; parallel and interpolation should ensure that the standard requirements of small distance construction or mutual modesty, in case of conflict with pipelines should be protected. Deal with the interference and collision of various professional pipelines, coordinate the conflict of air duct, water pipe, cable bridge, fire fighting, water supply and drainage pipe, communication, signal bridge and so on.