搜索澳门新萄京8522关键词找到我们澳门新萄京8522(www.8522.com)!

澳门新萄京8522-新闻资讯>公司快讯>新萄京8522的实施应该注意哪些原则性问题?

其他案例

新萄京8522的实施应该注意哪些原则性问题?

来源:     发表日期: 2019-06-14 14:42:47     浏览次数:次    
新萄京8522是结实衔接于已做抗震设计的建筑构造体的管路、槽系统及设备,以地震力为主要荷载的支撑系统,原有普通意义的支吊架系统是以重力为主要荷载的支撑系统,这两种支撑系统的设置并不反复而是相辅相成的。台湾胜利大学建筑研讨所黄乔俊以地震实验台振动台模仿南投县浦里镇一停车场喷淋管路得出的结论是:加装抗震支撑系统管路的各点位移较未装置抗震支撑者降低5~10倍,有效地进步了管路系统的抗震性能。
Earthquake-resistant brackets are pipes, grooves and equipments that are firmly connected to the building structures that have been designed for earthquake resistance. The bracing system with seismic force as the main load is the bracing system with gravity as the main load. The two bracing systems are not repeated but complementary. Huang Qiaojun, Architectural Seminar Institute of Shengli University of Taiwan, imitated the sprinkler pipeline of a parking lot in Puli Town, Nantou County, with the shaking table of the seismic experimental platform. The conclusion is that the displacement of each point of the pipeline with the anti-seismic bracing system is 5-10 times lower than that without the anti-seismic bracing system, which effectively improves the anti-seismic performance of the pipeline system.
1、由于地铁工程公开空间狭小,而所触及到的机电管线种类繁多,有通风空调、建筑电气、智能建筑、给排水及消防、喷淋、通讯、信号等众多专业的管线。由于管线功用品种多,施工的办法不尽相同,有风管、给水及消防管、高压细水雾管、空调冷水管、上下压电缆桥架、通号线槽、照明、控制、监控等线管;管线本身特性不同,装置的请求不同:如强电与弱电、有压与无压、高压与低压、大管与小管、平行与穿插等,假如不统一布置和提早规划,其各专业管线的抵触将随同施工的整个过程。
1. Because of the narrow open space of Metro project, there are many kinds of mechanical and electrical pipelines, such as ventilation and air conditioning, building electrical, intelligent building, water supply and drainage, fire protection, sprinkler, communication, signal and many other professional pipelines. Due to the variety of pipeline functions, the construction methods are different, such as air duct, water supply and fire fighting pipe, high-pressure water mist pipe, air conditioning cold pipe, upper and lower piezoelectric cable bridge, through line trough, lighting, control, monitoring and other pipelines; the characteristics of pipeline itself are different, and the requirements of devices are different: strong and weak electricity, voltage and non-voltage, high and low voltage, large and small pipes, parallel and interpolation, etc. If not unified layout and early planning, the conflict of its professional pipelines will follow the whole process of construction.
澳门新萄京8522
2、在优化综合管线时,制定了可供多方遵照的避让准绳:
2. In optimizing the comprehensive pipeline, the criteria for avoiding collision are formulated for many parties to follow:
1)在综合支吊架上装置的各专业管线恪守“电上、风中、水下,小管让大管、有压管让无压管、弱电避强电、易弯曲的管线让不易弯曲的管线、不用经常检修的管让需经常检修的管”的总准绳,即平行布置管线时电气设备的管线位于上方,通风空调的风管位于中间层,一切水管位于下层。
1) The professional pipelines installed on the comprehensive support and hanger strictly adhere to the general line of "on-line, under-water, under-wind, under-water, under-water, under-pressure, under-pressure, under-voltage, under-voltage, under-voltage, under-voltage, under-voltage, under-voltage, flexible pipelines to bend pipelines that are not easy to bend, pipelines that need regular maintenance without regular maintenance" that is, when parallel pipelines are laid, the pipelines of electrical equipment are located at the top, and the ducts of ventilation and air conditioning are located in the middle layer. All water pipes are located at the lowest level.
感谢您的阅读与观看,本文的精彩内容来自:澳门新萄京8522我们会有更多的精彩内容继续为您呈现,详情请点击:
Thank you for your reading and watching. The wonderful content of this article comes from: We will continue to present more wonderful contents to you from the manufacturers of anti-seismic brackets. For more details, please click on .
返回上一步
打印此页
?
QQ咨询
0531-88259217
微信扫一扫
XML 地图 | Sitemap 地图