新萄京8522的施工过程

来源:     发表日期: 2019-03-25 14:30:26     浏览次数:次    
  新萄京8522的优化原则:1、由于地铁地下空间狭窄,参与支持和蒸汽水机电综合管线的各种衣架、通风与空调、建筑电气、智能大厦、给排水、消防、喷淋、通信、信号、和许多其他专业的管道。
  The optimization principles of anti-seismic support: 1. Because of the narrow underground space of metro, various hangers, ventilation and air conditioning, building electrical, intelligent building, water supply and drainage, fire fighting, sprinkler, communication, signal, and many other professional pipelines are involved in supporting and steam-water electromechanical integrated pipelines.
  因为各种各样的管道系统,施工方法是不一样的,有风管、给水及消防管,高压细水雾的管道,空调冷水管,高低压电缆塔板数、槽、照明、控制、监测、行管等;管道的特性是不同的,不同的安装要求:如强电和弱电,有压力和无压力,高压和低压,大的和小的管,平行和交叉,等等,如果不事先统一安排和规划,各专业管线的冲突将伴随着施工的全过程。
  Because of various pipeline systems, the construction methods are different, such as air duct, water supply and fire fighting pipe, high pressure water mist pipeline, air conditioning cold water pipe, high and low voltage cable tray number, trough, lighting, control, monitoring, line pipe, etc. The characteristics of pipeline are different, different installation requirements: strong and weak electricity, pressure and no pressure, high and low pressure, large and small.  Pipeline, parallel and cross, and so on, if not arranged and planned in advance, the conflict of professional pipelines will accompany the whole process of construction.
  2.在对综合管线进行优化时,制定了多方避让原则:
  2. When optimizing the comprehensive pipeline, the principle of multi-party concession avoidance is formulated.
  1)安装的每个主要汽水管道的全面遵守"电、风、水、小管填,压力管道没有压力管,从高压线电流弱,灵活使弯曲的管道,需要经常维修管道不需要检查"管道平行排列的一般原则,当管道位于电气设备的顶部,通风和空调管道位于中间层,所有的管道位于底部。
  1) Every main steam and water pipeline installed complies with the general principle of parallel arrangement of pipelines that are "filled with electricity, wind, water and small pipes, pressure pipes have no pressure pipes, and bend pipes flexibly from weak current of high-voltage lines, requiring frequent maintenance without inspection". When pipes are located at the top of electrical equipment, ventilation and air conditioning pipes are located in the middle layer, and all pipes are located at the bottom.
  (2)强、弱电、高压、低压、强弱电及其他管线应按各自的规格,平行方向应多。平行和交叉应确保规范要求建造或相互作用的小距离,并在有冲突管道时采取保护措施。
  (2) Strong and weak current, high voltage, low voltage, strong and weak current and other pipelines shall be in accordance with their respective specifications and in more parallel directions. Parallel and cross-cutting shall ensure that specifications require small distances for construction or interaction and take protective measures in case of conflicting pipelines.
  成品支持各种专业管道的干扰和碰撞,协调空气管道、水管、电缆桥架、消防、排水管道与通信、信号桥等的冲突。
  The finished products support the interference and collision of various professional pipes, and coordinate the conflicts between air pipes, water pipes, cable bridges, fire fighting, drainage pipes and communication, signal bridges, etc.
  新萄京8522是经抗震加固后的建筑给水排水、消防、供暖、通风、空调、燃气、热力、电力、通讯等机电工程设施,当遭遇到本地区抗震设防烈度的地震发生时,可以达到减轻地震破坏,减少和尽可能防止次生灾害的发生,从而达到减少人员伤亡及财产损失的目的。机电新萄京8522是限制附属机电工程设施产生位移,控制设施振动,并将荷载传递至承载结构上的各类组件或装置。
  Anti-seismic bracket is a mechanical and electrical engineering facility, such as water supply and drainage, fire fighting, heating, ventilation, air-conditioning, gas, heat, electricity, communication and so on. When encountering earthquakes with seismic fortification intensity in the region, it can reduce earthquake damage, reduce and prevent secondary disasters as much as possible, so as to reduce casualties and property losses. Mechanical and electrical anti-seismic bracket is a kind of component or device that restricts the displacement of auxiliary mechanical and electrical engineering facilities, controls the vibration of the facilities, and transfers the load to the bearing structure.
                                      澳门新萄京8522
  风管新萄京8522在墙上的安装,沿墙敷设的风管常采用托架固定。托架安装时,圆形风管标高以风管的轴线标高为准,矩形风管的标高以管底标高为准。根据风管的标高画出托架横梁上表面的位置线,再根据风管新萄京8522的间距要求,确定支架的具体位置,然后将托架的衡量固定在墙壁上。固定的方法可采用预埋法、栽埋法、膨胀螺栓法和射钉法等。关于新萄京8522就将单介绍到这里,如果您还有不了解欢迎电话联系我们!
  The bracket is often used to fix the wind pipe laid along the wall when the wind pipe anti-seismic bracket is installed on the wall. When bracket is installed, the elevation of circular duct is based on the axis elevation of duct, and the elevation of rectangular duct is based on the bottom elevation of duct.  According to the elevation of the air duct, the position line of the upper surface of the bracket beam is drawn. Then according to the spacing requirement of the air duct anti-seismic bracket, the specific position of the bracket is determined, and then the bracket measurement is fixed on the wall. Fixed methods include embedding method, planting method, expanding bolt method and shooting nail method. About the anti-seismic bracket will be introduced here, if you still do not know, please call us!