搜索澳门新萄京8522关键词找到我们澳门新萄京8522(www.8522.com)!

澳门新萄京8522-新闻资讯>行业咨询>风管新萄京8522工艺、风管新萄京8522

其他案例

风管新萄京8522工艺、风管新萄京8522

来源:     发表日期: 2019-02-22 15:10:14     浏览次数:次    
风管新萄京8522工艺、风管新萄京8522
Wind pipe anti-seismic bracket technology and wind pipe anti-seismic bracket
目前,随着技术的不时提高,风管新萄京8522工艺,成品支架的呈现推进着新萄京8522建立的开展。新萄京8522作爲我国的修建机电抗震零碎次要采取的抗震资料,当发作地震时可以加重修建物的地震损伤,以到达抗震的效果。那麼成品支架和传统支架间又有什麼改良与区别呢?
At present, with the continuous improvement of technology, the technology of wind pipe anti-seismic support and the appearance of finished support promote the development of anti-seismic support. Seismic brackets, as the secondary seismic data of China's construction machinery, can aggravate the earthquake damage of buildings when an earthquake occurs, so as to achieve the effect of earthquake resistance. What are the improvements and differences between the finished stent and the traditional stent?
1、施工方便:在施工时不同于传统支架需求焊接和预钻孔,而且随实践、突发状况还能停止调整或装配,其装置速度可以快好几倍,风管新萄京8522装置,并且成品支架零部件可反复运用,相比于焊死的方式愈加浪费本钱风管新萄京8522,风管澳门新萄京8522,风管新萄京8522
1. Convenient construction: Different from the traditional bracket needs welding and pre-drilling, and can stop adjusting or assembling with practice and unexpected situation. Its installation speed can be several times faster, the wind pipe anti-seismic bracket device, and the finished bracket components can be used repeatedly. Compared with the way of welding death, the cost of wind pipe anti-seismic bracket is more wasted, wind pipe anti-seismic bracket manufacturers, wind pipe anti-seismic bracket manufacturers, wind pipe anti-seismic bracket. Bracket
澳门新萄京8522
风管新萄京8522新萄京8522组合装置时需求留意以下几点:
The following points should be paid attention to when assembling the anti-seismic bracket of air duct anti-seismic bracket:
1、质量有保证的组合新萄京8522通常具有很高的强度,但是要和构造主体停止牢靠连才干起到良好的效果,所以在装置时首先要依据被承托物的设计标高来确定支架地位线,风管新萄京8522,然后依据设计好的间距来确认每一个组合新萄京8522的详细地位,确定好后再停止装置。
1. Composite aseismic brackets with guaranteed quality usually have high strength, but they have good effect on stopping the main body of the structure. Therefore, the position line of the bracket and the wind pipe aseismic bracket should be determined according to the design elevation of the bracket, and then the detailed position of each composite aseismic bracket should be confirmed according to the designed spacing, and then stop after the determination. Stop device.
2、假如组合新萄京8522需求装置在柱子下面,那麼应该留意采用预埋埋钢板接法或预埋螺栓法等施工办法,确保新萄京8522可以结实的装置在柱子下面。
2. If the composite anti-seismic bracket needs to be installed under the pillar, then we should pay attention to the construction methods such as embedded steel plate connection or embedded bolt method to ensure that the anti-seismic bracket can be strong under the pillar.
3、预备装置的组合新萄京8522尺寸和型式要和现场实践状况相符,支架上孔眼留意要采用钻床停止开孔,而不要运用电或气焊停止开孔。
3. The size and type of the combined anti-seismic support of the preparatory device should be in accordance with the field practice. The drilling machine should be used to stop the opening of the hole on the support, instead of using electric or gas welding to stop the opening.
4、需求停止焊接处置时,组合新萄京8522上的焊缝要丰满并且没有夹渣景象,除埋入基层中的局部外还要留意及时运用刷防锈漆做好防护处置。
4. When the welding disposal needs to stop, the weld seam on the combined anti-seismic bracket should be full and there is no slag inclusion. Besides the part buried in the base, we should pay attention to the timely use of rust-proof paint for protection disposal.
综上所述有澳门新萄京8522(www.8522.com)提供,想了解澳门新萄京8522知识,欢迎关注我们的网站:谢谢支持!
In summary, all the above-mentioned Shandong Shengnian Intelligent Technology Co., Ltd. provides, in order to understand the knowledge of seismic bracket manufacturers, welcome to pay attention to our website: Thank you for your support!
返回上一步
打印此页
?
QQ咨询
0531-88259217
微信扫一扫
XML 地图 | Sitemap 地图